Iron Bridge Parking Garage

Project Details

The parking garage on the Iron Bridge Office Campus was completed in 2007 to provide parking for the Iron Bridge tenants. The garage structure utilized both tilt-up and cast-in-place construction in its design The four level, 577 stall garage has central ramps to hide the sloping floors and maintain a horizontal look on the exterior. Brick was cast into the vehicle barrier spandrel panels to match the architecture of the other campus buildings. The Iron Bridge Parking Garage received a design award from the Washington State Concrete Construction Association in 2008.

Start Date: 2007
End Date: 2007
Number of Stories: 4
Location: Spokane, WA
Scroll to Top